Work types | Cost, UZS |
Split-systems conditioners installation | |
Split system installation КФР-25 capacity 9 kWt (standard installation) | – |
Split system installation КФР-35 capacity 12 kWt (standard installation) | – |
Split system installation КФР-35 capacity 18 kWt (standard installation) | – |
Split system installation КФР-61 capacity 24 kWt (standard installation) | – |
Split system installation КФР-70 (standard installation) | – |
Split system installation КФР-90 (standard installation) | – |
Split system installation, capacity is more than КФР-90 (standard installation) | – |
Multi split systems conditioners installation | |
Installation of a multi-split system: each indoor unit is evaluated as a separate split-system of corresponding capacity, i.e. the cost depends on the number of hair dryers | – |
Installation of cassette conditioners | |
Installation of cassette conditioners КФР-35 (standard installation) | – |
Installation of cassette conditioners КФР-51 (standard installation) | – |
Installation of cassette conditioners КФР-61 (standard installation) | – |
Installation of cassette conditioners КФР-70 (standard installation) | – |
Installation of cassette conditioners КФР-90 (standard installation) | – |
Installation of cassette conditioners КФР-120 (standard installation) | – |
Installation of cassette conditioners КФР-150 (standard installation) | – |
Installation of cassette conditioners, higher than КФР-150 (standard installation) | – |
Column air conditioners | |
Installation of column air condirioners КФР-70 (standard installation) | – |
Installation of column air condirioners КФР-90 (standard installation) | – |
Installation of column air condirioners КФР-120 (standard installation) | – |
Installation of column air condirioners КФР-150 (standard installation) | – |
Installation of column air condirioners КФР-250 (standard installation) | – |
Installation of channel air conditioners | |
Installation of channel air conditioners КФР-25 (standard installation) | – |
Installation of channel air conditioners КФР-35 (standard installation) | – |
Installation of channel air conditioners КФР-51 (standard installation) | – |
Installation of channel air conditioners КФР-61 (standard installation) | – |
Installation of channel air conditioners КФР-70 (standard installation) | – |
Installation of channel air conditioners КФР-90 (standard installation) | – |
Installation of channel air conditioners КФР-120 (standard installation) | – |
Installation of channel air conditioners КФР-150 (standard installation) | – |
Installation of channel air conditioners КФР-250 (standard installation) | – |
Installation of floor and ceiling air conditioners | |
Installation of floor and ceiling air conditioners КФР-25 (standard installation) | – |
Installation of floor and ceiling air conditioners КФР-35 (standard installation) | – |
Installation of floor and ceiling air conditioners КФР-51 (standard installation) | – |
Installation of floor and ceiling air conditioners КФР-61 (standard installation) | – |
Installation of floor and ceiling air conditioners КФР-70 (standard installation) | – |
Installation of floor and ceiling air conditioners КФР-90 (standard installation) | – |
Installation of floor and ceiling air conditioners КФР-120 (standard installation) | – |
Installation of floor and ceiling air conditioners КФР-150 (standard installation) | – |
Installation of floor and ceiling air conditioners КФР-250 (standard installation) | – |
Installation of thermal curtain up to 1000 mm, installation height up to 3 m, without power supply | – |
Installation of thermal curtain with length from 1000 to 1500 mm, installation height up to 3 m, without power supply | – |
Installation of thermal curtain length from 1500 to 1800 mm, installation height up to 3 m, without power supply | – |
Installation of thermal curtain length from 1800 to 2000 mm, installation height up to 3 m, without power supply | – |
Installation of an infrared panel heater, without power supply | – |
Prices for additional works and processed materials | Cost, UZS |
Pump installation (without pump cost) | – |
Protective flag for air conditioners. Material – galvanized steel.
Sizes 800х500 mm. |
– |
Protective flag for air conditioners. Material – galvanized steel.
Sizes 900х500 mm. |
– |
Protective flag for air conditioners. Material – galvanized steel.
Sizes 1000х500 mm. |
– |
Protective flag for air conditioners. Material – painted galvanized steel.
Sizes 800х500 mm. |
– |
Protective flag for air conditioners. Material – painted galvanized steel.
Sizes 900х500 mm. |
– |
Protective flag for air conditioners. Material – painted galvanized steel.
Sizes 1000х500 mm. |
– |
Roof Air Conditioning System | – |
Protective guard (grid) for the outdoor unit of the air conditioner | – |
Installation of beam for opening, which is wider than the outdoor unit (for mounting the outdoor unit) | – |
Drain pump for split system with installation (allows to place the drainage drain above the level of the indoor unit) | – |
Automatic power supply with installation of an electric board | – |
Other services for installation of air conditioning systems | Cost, UZS |
Re-departure of the brigade within Tashkent city | – |
False call of a brigade of two people | – |
Additional communications for air conditioners up to 9 kW (КФР 25), i.e. copper tube extension for more than 1 meter | – |
Additional communications for air conditioners up to 12 kW (КФР-35), i.e. сopper tube extension for more than 1 meter | – |
Additional communications for air conditioners up to 18 kW (КФР-51), i.e. сopper tube extension for more than 1 meter | – |
Additional communications for air conditioners up to 24 kW (КФР-61), i.e. сopper tube extension for more than 1 meter | – |
Additional communications for air conditioners (КФР-70), i.e. сopper tube extension for more than 1 meter | – |
Additional communications for air conditioners (КФР-90), i.e. сopper tube extension for more than 1 meter | – |
Additional communications for air conditioners (КФР-120), i.e. сopper tube extension for more than 1 meter | – |
Additional communications for air conditioners (КФР-150), i.e. сopper tube extension for more than 1 meter | – |
Additional communications for air conditioners (КФР-250), i.e. сopper tube extension for more than 1 meter | – |
Climber for installation (dismantling), hourly payment | – |
Raiser (height is up to 3-4 floors), for 5 hours | – |
Groove (groove in the wall for laying communications) in a brick, for 1 m. | – |
Groove (groove in the wall for laying communications) in concrete, for 1 m. | – |
Groove (groove in the wall for laying communications) in ferroconcrete, for 1 m. | – |
Extra box 60 х 100 mm, for 1 m. | – |
Extra box 60 х 60 mm, for 1 m. | – |
Extra box 15 х 18 mm or corrugated tube | – |
Additional electrical cable for air conditioners, with installation, for 1 m. KFR25-35 | – |
Additional electrical cable for air conditioners, with mounting at height of more than 2 m, per 1 m. KFR25-35 | – |
Punching an additional hole under the main route in gypsum board | – |
Punching an additional hole under the main route (wall thickness is up to 80 sm) | – |
Punching an additional hole under the main route (wall thickness is up to 80 sm), inconvenient conditions | – |
Punching an additional hole under the main route in the main wall with a wall thickness of more than 80 cm, for every full or incomplete 10 cm | – |
Punching an additional hole under the main track in the main wall with a wall thickness of over 80 cm in inconvenient conditions, for every full or incomplete 10 cm | – |
Punching an additional hole under the electrical cable in the bulkhead (concrete, brick) or the capital wall up to 80 cm | – |
Punching an additional hole under the electrical cable in the partition (concrete, brick) or the main wall, in inconvenient conditions | – |
Punching an additional hole under electric cable in capital wall over 80 cm is the same as the hole for the main route | – |
Disassembling of air conditioners for split systemsof air conditioners for split systems | – |
Disassembling of protective visor | – |
Disassembling of channel 1 m | – |
Joint (just one) | – |
Electrical connection | – |
Extra charge for transportation of air conditioners per 1 kilometer | – |
Additional payment for air conditioners installation of air conditioners outside of Tashkent, for 1 kilometer (warranty support) | – |
Supplement for night work (beginning after 18-00), per 1 air conditioner | – |
* Any deviation from standard installation leads to an increase in work cost.
Standard installation is the most typical installation of the air conditioner.
Standard installation of air conditioners (standard installation) is carried out if:
1) Services of an industrial climber or aerial platforms are not required.
– When using an industrial climber, the problem of any complexity is solved.
– Sometimes it is advisable to use an aerial platform. (For example, installation at the height of the third floor of a 16-story building).
2) Installation of air conditioner without wall shattering.
3) The route between the air conditioning units of the split system does not exceed 5 meters, drainage – 3 meters.
– The track includes: a freon loop with a heater, a decorative box, an electric cable, a drainage pipe, brackets for an external block, fixing material.
* Standard installation uses an italian decorative box, usually of two types: 60×60 and 60×80 mm. Grooving is a deepening in wall surface with a shot cutter and a powerful perforator with a depth of up to 10 cm. The cost of grooving is indicated per running meter, depending on the type of wall (brick, concrete, reinforced concrete).
* The drainage pipe for draining the condensate from indoor unit is discharged outside. The drainage pipe is not removed from the external unit.
* The power cable is laid in a decorative box of white color, section is 16х16 mm and length is up to 2 m. The power cable is laid to the electrical outlet (up to 5 meters).
* The indoor unit of the air conditioner is installed on the wall.
* The standard installation of air conditioning split-system takes from 4 to 6 hours.