- Design of general ventilation scheme
- Calculation of heat input for ventilation design
- Requirements for ventilation design
- Technical and economical requirements for ventilation design
- Working project of ventilation system
There are regulatory documents for heating, ventilation and conditioning systems. One of the main such documents is construction norms and regulations 2.04.05-91 (2000) “Heating, ventilation and conditioning” and SNiP, indicating the necessary type of the building. Consumption and temperature of supply air for ventilation is designed in accordance with mandatory annex to SNiP 2.04.05-91 (2000) where the certain method of calculation is indicated. For example, for designing of administrative buildings ventilation is necessary to take into account SNiP 2.09.04-87, part 4 “Heating, ventilation and conditioning of the air”.
Thus, from 3 main sources, such as:
- Set of ventilation schemes known for this building
- Regulatory documents (SNiP and other documents)
- Specific customer’s requirements
– Principle scheme of premises ventilation and normative multiplicities are of air duct are deduced. Principle scheme of premises ventilation and normative multiplicities are of air duct are deduced.