Works title |
Works content |
Un.meas. |
Works cost, sum. |
Installation of boiler in private house |
Installation of boilers and water heaters |
Wall gas boiler installation |
Unloading, wall mounting, hydraulic connection |
pc. |
Negotiable |
Floor boiler installation (up to 12 kW) |
Unloading, wall mounting, hydraulic connection |
pc. |
Negotiable |
Floor boiler installation (from 12 kW up to 50 kW) |
Unloading, wall mounting, hydraulic connection |
pc. |
Negotiable |
Floor boiler installation (more than 50 kW) |
Unloading, wall mounting, hydraulic connection |
pc. |
Negotiable |
Electric boiler installation (220 V) |
Unloading, wall mounting, hydraulic connection |
pc. |
Negotiable |
Electric boiler installation (380 V) |
Unloading, wall mounting, hydraulic connection |
pc. |
Negotiable |
Indirect heating boiler installation (up to 200 liters) |
Unloading, installing, hydraulic connection |
pc. |
Negotiable |
Indirect heating boiler installation (more than 200 liters) |
Unloading, installing, hydraulic connection |
pc. |
Negotiable |
Gas burner installation |
Installation on boiler, connection to gas main |
pc. |
Negotiable |
Diesel burner installation |
Installation on boiler, connection to diesel line |
pc. |
Negotiable |
Combined burner installation (gas/diesel) |
Installation on boiler, connection to gas main and diesel line |
pc. |
Negotiable |
Expansion tank installation (boiler, heating, HWS) |
Unloading, installing, hydraulic connection |
pc. |
Negotiable |
Vessel security group installation |
Installing, sealing |
pc. |
Negotiable |
Boiler security group installation |
Installing, sealing |
pc. |
Negotiable |
Pressure reducer installation, feed valve |
Installing, sealing |
pc. |
Negotiable |
Installation of circulating, recirculating and charging pump |
Installing, sealing |
pc. |
Negotiable |
Collector, pump groups installation |
Installation of factory distribution manifold (Meibes, analogs) |
Installing (floor or wall type), assemblage, connection to pumping groups, warming up |
pc. |
Negotiable |
Installation of individual distribution manifold from WGP (for 3 circuits) |
Installing (floor or wall type), assemblage, connection to pumping groups, warming up |
pc. |
Negotiable |
Installation of an individual distribution manifold from WGP (for 4-5 circuits) |
pc. |
Negotiable |
Installation of individual distribution manifold from WGP (more than 5 circuits) |
pc. |
Negotiable |
Hydraulic separator installation (hydraulic arrow) |
Installing, connecting to connector |
pc. |
Negotiable |
Installation of pumping group of factory readiness (Meibes, analogs) |
Installing, connecting to connector |
pc. |
Negotiable |
Installation of individual assembly pump group (combined) |
Assemblage, installing, connecting to connector |
pc. |
Negotiable |
Installation of valves, balancing valves, filters |
Installing, sealing |
pc. |
Negotiable |
Installation of measuring devices (thermometer, manometer), air vent |
Installing, sealing |
pc. |
Negotiable |
Installation of isolation technology (shut-off valves, drain valves) |
Installing, sealing |
pc. |
Negotiable |
Installation of chimney sandwich-tube (two-layer) |
Chimney installation in building canal, leading out to a roof, connection to a boiler with gathering of a condensate and revision |
r.m. |
Negotiable |
Installation of boiler room automation |
Installation of weather-dependent automation with control of 3 circuits |
Installing, connecting to devices of boiler controller |
pc. |
Negotiable |
Installation of additional automation units (modules) for additional circuits and cascade boilers connection |
Installing, connecting to devices of boiler controller and main automatical block |
pc. |
Negotiable |
Installation of surface sensors |
Installation of boiler, vessel, feed (return) temperature line |
pc. |
Negotiable |
Outdoor sensor installation |
Installation of outdoor temperature sensor with connection to automation unit |
pc. |
Negotiable |
Room temperature sensor installation |
Installation of room temperature sensor with connection to automation unit |
pc. |
Negotiable |
Electrical piping of boiler room |
Laying of electric cable in channels for connection of vessel, boiler, pumps, servo drives |
set |
Negotiable |
Servo drive installation |
Servo-drive installation in adjustable contour |
pc. |
Negotiable |
Hydraulic tests |
Filling the boiler with a heat carrier, pressure test |
set |
Negotiable |
Start-up of boiler house with manual control |
Start-up of vessel, pumps, manual regulation of boiler coolant and heating circuit parameters |
set |
Negotiable |
Start-up of boiler house with automatical control |
Start-up of vesel, pumps, adjustment of boiler room automation |
set |
Negotiable |
Private house heating system installation |
Wall radiator installation, towel warmer (copper, metal) |
Mounting on the wall, hydraulic connection to heating pipes through kit (stop valves) |
pc. |
Negotiable |
Wall radiator installation, towel warmer (polypropylene, metal-plastic) |
pc. |
Negotiable |
Installation of convector built into floor (without fan) |
Installation of convector, connection to supply pipelines |
pc. |
Negotiable |
Installation of convector built into floor (with fan) |
Convector installation, connection to supply pipelines, fan electrical connection |
pc. |
Negotiable |
Installation of collector cabinet with collector for 3-4 taps |
Cabinet installation (built-in or hinged), installation of manifold and connection to pipelines |
pc. |
Negotiable |
Installation of collector cabinet with collector for 5-7 taps |
pc. |
Negotiable |
Installation of collector cabinet with collector for 8 or more taps |
pc. |
Negotiable |
Installation of main pipelines (standpipes, laying pipes) – copper, metal |
Laying and welding of pipes with diameter of 22-50 mm, with implementation of floor taps |
r.m. |
Negotiable |
Installation of main pipelines (standpipes, laying pipes) – polypropylene, metal-plastic |
Laying of pipes with diameter of 22-50 mm, with implementation of floor tapping (soldering, threaded and press connections) |
r.m. |
Negotiable |
Installation of feed pipelines (standpipes, laying pipes) – polypropylene, metal-plastic |
Laying of pipes with diameter of less than 22 mm |
r.m. |
Negotiable |
Pipelines heating-up |
Installation of a tubular heater on heating pipelines |
r.m. |
Negotiable |
Installing thermostatic controller for radiator |
Thermal head installing on radiator or towel warmer |
pc. |
Negotiable |
Hydraulic tests |
Filling the system with a coolant and pressure testing |
100 sq.m. of building |
Negotiable |
Start-up |
Hydraulic balancing of heating system |
for 1 point |
Negotiable |
Water warm floor system installation |
Installation of collector cabinet with collector for 3-4 outlets |
Cabinet installation (built-in or hinged), installation of collector and connection to the circuits of warm floor |
pc. |
Negotiable |
Installation of collector cabinet with collector for 5-7 outlets |
pc. |
Negotiable |
Installation of collector cabinet with collector for 8 outlets and more |
pc. |
Negotiable |
Warm floor installation (copper) |
Laying of floor warmer, installation of pipelines, installation of heat-jointing |
r.m. |
Negotiable |
Warm floor installation (Metalloplast, polyethylene) |
r.m. |
Negotiable |
Mannual controller installation |
Installation of built-in (the wall) controller of warm floor temperature – Unibox |
pc. |
Negotiable |
Servo-drive installation into collector cabinet |
Servo-drive installation to collector circuit |
pc. |
Negotiable |
Automatical block controller installation |
Installing and connecting of electrical thermostat (without cabel) |
pc. |
Negotiable |
Hydraulic tests |
Filling the floor with coolant and pressure testing |
for circuit |
Negotiable |
Start-up |
Warm floor circuits balancing |
for circuit |
Negotiable |
Private house water supply system installation |
Water supply point installation |
Provision of hot and cold water to consumer, mounting of water outlets (without plumbing installation) |
pc. |
Negotiable |
Water supply point installation with recirculation line |
Provision of cold and hot water with recirculation line to consumer, mounting of water outlets (without plumbing installation) |
pc. |
Negotiable |
Water supply collector cabinet installation with collector for 3-4 taps |
Cabinet installation (built-in or hinged), installation of collector for hot and cold water supply, connection to pipelines |
pc. |
Negotiable |
Water supply collector cabinet installation with collector for 5-7 taps |
pc. |
Negotiable |
Water supply collector cabinet installation with collector for 8 taps and more |
pc. |
Negotiable |
Installation of main pipelines (stand-pipes) – polypropylene, metal-plastic |
Laying of pipes with diameter of 22-50 mm, with implementation of floor tapping (soldering, threaded and press connections) |
r.m. |
Negotiable |
Pipelines heating-up |
Installation of tubular insulation for water supply pipelines |
r.m. |
Negotiable |
Electrical boiler installation |
Unloading, installing, hydraulic connection |
pc. |
Negotiable |
Installation of downhole pump with pressure switch |
Unloading, wall mounting, hydraulic and electrical connection to pressure switch |
pc. |
Negotiable |
Installation of expansion tank (hydro-accumulator) |
Unloading, installing, hydraulic connection |
pc. |
Negotiable |
Pump station installation |
Unloading, installing, hydraulic connection |
pc. |
Negotiable |
Water-preparing system installation |
Unloading, backfilling, installation, hydraulic connection |
for cylinder |
Negotiable |
Hydraulic tests |
Water filling and pressure testing |
for system |
Negotiable |
Start-up |
Setting the limits of operation on pressure switch, programming control valves |
for cylinder |
Negotiable |
Declared cost of work does not include: cost of equipment, spare parts and consumables. |